top of page
Suche

Perimeter Protection Ireland Gillinstown Solar Farm

  • 24. Feb. 2023
  • 1 Min. Lesezeit

Aktualisiert: 15. Mai 2023

With a length of 6,335m of fencing and a main gate, alarm.direct secured the Gillinstown #solarfarm.


The project provides solar power from the 136 MW #photovoltaic plant and has been successfully completed.




 
 
 

Comments


  • Facebook
  • logo-instagram-alarm-direct
  • LinkedIn
bottom of page